OGR Booster pump (E) checking complete.
Posted onProblem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…
DTW-202 NEW LIT INSTALLATION
Posted onThere was a damaged LIT. After regeneration work we have install a new LIT
CCTV maintenance at DTW-109
Posted onIn DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
ACTIVITY | CCTV | DAILY REPORTS | DTW | ParvezDTW-122 & 123 Optical Fiber Maintenance
Posted onDTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…
Optical Fiber restoration work at DTW103
Posted onIn the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
IRP-1 All DTW NEV Voltage check
Posted on