Skip to content
TEAM ICE

TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
TEAM ICE
  • ACTIVITY | CCTV | DTW

    CCTV maintenance at DTW-103

    Posted onOctober 6, 2022October 6, 2022

    In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-103Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW- 201 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…

    Listen to the Message DTW- 201 Radio Communication checking complete.Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW -118 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…

    Listen to the Message DTW -118 Radio Communication checking complete.Continue

  • ACTIVITY | CCTV | DTW | Uncategorized

    CCTV maintenance at DTW-109

    Posted onOctober 6, 2022October 6, 2022

    In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-109Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW- 107 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…

    Listen to the Message DTW- 107 Radio Communication checking complete.Continue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW 117 total 2 camera installation work

    Posted onOctober 6, 2022October 6, 2022

    ই পি অার বি এর কাজের জন্য যেই দুইটি সি সি ক্যামেরার পিলার সরানো হয়েছিলো ৷ সেই দুইটি সিসি ক্যামেরার তার ছিরে গিয়েছে…

    Listen to the Message DTW 117 total 2 camera installation workContinue

  • ACTIVITY | CCTV | DTW

    A new PoE switch install at DTW-201

    Posted onOctober 6, 2022October 6, 2022

    Previous PoE switch has port problem.

    Listen to the Message A new PoE switch install at DTW-201Continue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW#201 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…

    Listen to the Message DTW#201 CCTV Checking Maintenance Complete.Continue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW#105 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…

    Listen to the Message DTW#105 CCTV Checking Maintenance Complete.Continue

  • ACTIVITY | DAILY REPORTS | DTW

    Dtw-122 serial Comm.New UTP Cable installing complete.

    Posted onSeptember 28, 2022September 28, 2022

    Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…

    Listen to the Message Dtw-122 serial Comm.New UTP Cable installing complete.Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers