  • ACTIVITY | CCTV | DTW | Uncategorized

    CCTV Maintenance At DTW-102

    Posted onOctober 23, 2022October 23, 2022

    1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang

    Listen to the Message CCTV Maintenance At DTW-102Continue

  • ACTIVITY | DTW

    EPRV Work DTW-117 By ICE Team & SEL

    Posted onOctober 22, 2022October 22, 2022

    DTW-117

    Listen to the Message EPRV Work DTW-117 By ICE Team & SELContinue

  • ACTIVITY | DTW

    DTW-115 LIT Installing

    Posted onOctober 22, 2022October 23, 2022

    Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU

    Listen to the Message DTW-115 LIT InstallingContinue

  • ACTIVITY | CCTV | DTW

    CCTV Maintenance At DTW-222

    Posted onOctober 22, 2022October 22, 2022

    1.UTP Cable Change 2.Connector Change 3.IP Setup

    Listen to the Message CCTV Maintenance At DTW-222Continue

  • ACTIVITY | CCTV | DTW

    DTW-223 CCTV Establishment

    Posted onOctober 22, 2022October 22, 2022

    Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,

    Listen to the Message DTW-223 CCTV EstablishmentContinue

  • ACTIVITY | DAILY REPORTS | DTW

    EPRV work with DTW 103 by ICE Team & SEL

    Posted onOctober 22, 2022October 22, 2022

    Listen to the Message EPRV work with DTW 103 by ICE Team & SELContinue

  • ACTIVITY | DAILY REPORTS | DTW | REPORTS

    IRP-1 (101 to 123) & IRP-2 (201 to 223) I & C device checking complete.

    Posted onOctober 22, 2022October 22, 2022

    Listen to the Message IRP-1 (101 to 123) & IRP-2 (201 to 223) I & C device checking complete.Continue

  • ACTIVITY | DAILY REPORTS | DTW | REPORTS

    DTW-111,113,114,115,117,118,119,120,121,122,123 I & C device checking complete.

    Posted onOctober 18, 2022October 18, 2022

    Listen to the Message DTW-111,113,114,115,117,118,119,120,121,122,123 I & C device checking complete.Continue

  • ACTIVITY | DAILY REPORTS | DTW | REPORTS

    DTW- 101,102,103,104,106,107,109,110 I & C Device checking work complete.

    Posted onOctober 17, 2022October 17, 2022

    Listen to the Message DTW- 101,102,103,104,106,107,109,110 I & C Device checking work complete.Continue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

    CCTV Maintenance At DTW-105

    Posted onOctober 17, 2022December 11, 2022

    2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup

    Listen to the Message CCTV Maintenance At DTW-105Continue

Page navigation

Previous PagePrevious 1 … 6 7 8 9 10 … 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers