IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
ScadaPack transfer from DTW-207 to 202 Done
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU