IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust
DTW-113 Scada Pack Programing And Install Done
Breaker installation for SCADA control Room Monitor Done
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
IRP-2 Sub-Station 1Nos New Server Rack Installation Done