Skip to content
TEAM ICE

TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
TEAM ICE
  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    Radio communication checking complete DTW 213.

    Posted onOctober 6, 2022October 12, 2022

    Observation: Radio communication checking complete DTW 213.1. In DTW 213, We checked up to 10 minutes. RSSI Value (Dc volts) MAX: 2.395V, MIN:…

    Listen to the Message Radio communication checking complete DTW 213.Continue

  • ACTIVITY | DAILY REPORTS | DTW | Pending Issue

    UVR checking complete at DTW 216

    Posted onOctober 6, 2022October 12, 2022

    Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 216 UVR checked, when plug PTT UVR…

    Listen to the Message UVR checking complete at DTW 216Continue

  • ACTIVITY | DTW

    CCTV camera maintenance & optical fiber rearrangement at DTW-117

    Posted onOctober 6, 2022October 6, 2022

    In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…

    Listen to the Message CCTV camera maintenance & optical fiber rearrangement at DTW-117Continue

  • ACTIVITY | CCTV | DTW

    CCTV maintenance at DTW-103

    Posted onOctober 6, 2022October 6, 2022

    In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-103Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW- 201 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…

    Listen to the Message DTW- 201 Radio Communication checking complete.Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW -118 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…

    Listen to the Message DTW -118 Radio Communication checking complete.Continue

  • ACTIVITY | CCTV | DTW | Uncategorized

    CCTV maintenance at DTW-109

    Posted onOctober 6, 2022October 6, 2022

    In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-109Continue

  • ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue

    DTW- 107 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…

    Listen to the Message DTW- 107 Radio Communication checking complete.Continue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW 117 total 2 camera installation work

    Posted onOctober 6, 2022October 6, 2022

    ই পি অার বি এর কাজের জন্য যেই দুইটি সি সি ক্যামেরার পিলার সরানো হয়েছিলো ৷ সেই দুইটি সিসি ক্যামেরার তার ছিরে গিয়েছে…

    Listen to the Message DTW 117 total 2 camera installation workContinue

  • ACTIVITY | CCTV | DTW

    A new PoE switch install at DTW-201

    Posted onOctober 6, 2022October 6, 2022

    Previous PoE switch has port problem.

    Listen to the Message A new PoE switch install at DTW-201Continue

Page navigation

Previous PagePrevious 1 … 31 32 33 34 35 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers