Findings: Switch problem found.
Action taken: Switch replace.




Findings: Switch problem found.
Action taken: Switch replace.




Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
There was so much dust
SL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…