Findings: Radio Modem become hang.
Action taken: Restart the Modem.

Findings: Radio Modem become hang.
Action taken: Restart the Modem.

APP Annual Procurement Plan for the year 2024-2025 SL. No Name of the Work Estimated Cost Specifications/Detail Documents 1 Underground Optical Fiber network…
Findings: Switch problem found. Action taken: Switch replace.
Findings: 1. Signal Cable problem. 2. GiMAC Rx & Rt port problem found. Action Taken: 1. Cable check. 2. VFD controller port check…
All Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.