1 Nos camera has UTP cable short ckt problem. We use 23 M new cable.






1 Nos camera has UTP cable short ckt problem. We use 23 M new cable.






Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2
Booster Pump (F) Motor Bearing Temperature Mismatch Between field and SCADA
There was so much dust
DTW – 107, 109, 119 CCTV panel cleaning completed. DTW 115, 118 DTW 114, 118
Cleaning Completed.