1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup



1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup



ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .