- CCTV Pool adjustments
- 1 new camera installation
- 1 new PoE Switch installation
- UTP cable change
- IP Setting










The Rehabilitation work is on going as long as 6 month. Any scenario of development of this DTW isn’t shown.After visiting this DTW,…
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
Previous ONU frequently becomes unstable/hang. So replace the ONU.