- 1 new camera installation
2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating




2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating




To solve this problem, we increase the height 1 meter more and change the direction.
2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
DTW-104,105,106,107 Cleaning Done