1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity












1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity












1. connector change 2. IP Setup
SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.