Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
1. connector change 2. IP Setup
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…
CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting