  • ACTIVITY | DAILY REPORTS | DTW | Pending Issue

    DTW- 206 RTU Panel Power System Checking & Problem Found.

    Posted onSeptember 10, 2022October 12, 2022

    problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

    Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

  • ACTIVITY | DAILY REPORTS

    IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.

    Posted onSeptember 10, 2022September 10, 2022

    problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…

    Listen to the Message IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.Continue

  • Product Specifications

    Modicon M340

    Posted onSeptember 10, 2022September 15, 2022

    Modicon M340 Related Items SL No Device Name Model Type Remarks 1 power supply module X80 – 100..240 V AC – 36 W…

    Listen to the Message Modicon M340Continue

  • Product Specifications

    DELL PowerEdge T330 Tower Server

    Posted onSeptember 9, 2022September 9, 2022

    Technical specification SL. NO Feature Technical specification Form factor Rackable tower server (5U when racked) Dimensions H: 430.3 mm (17.04 in); with foot…

    Listen to the Message DELL PowerEdge T330 Tower ServerContinue

  • ACTIVITY | DAILY REPORTS | DTW

    DTW115 SCADA PACK INSTALL COMPLETE

    Posted onSeptember 8, 2022September 9, 2022

    Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

  • ACTIVITY | CCTV | NETWORK CONNECTIVITY

    Optical Fiber restoration work at DTW103

    Posted onSeptember 7, 2022September 24, 2022

    In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

    Listen to the Message Optical Fiber restoration work at DTW103Continue

  • ACTIVITY | DAILY REPORTS | MOV

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

  • ACTIVITY | DAILY REPORTS

    OGR Booster Pump supply fan (4M02B) checking and findings.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

  • ACTIVITY | CCTV | DTW

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

  • Uncategorized

    DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checking

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checkingContinue

Page navigation

Previous PagePrevious 1 … 40 41 42 43 44 … 57 Next PageNext