1. IP Setup


1. IP Setup


DTW-106 CCTV Base Placement Done
There was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…
Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.
In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…
In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…