DTW-106 CCTV Base Placement Done
CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
IRP-2 All Dome Camera Lens Cleaning Done
Problem: 01 nos CC Camera Do not show footage in NAV.Problem found: Automatic IP has been changed in the dome Camera. Than IP…