New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.





New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.





2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
DTW-117