IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



AC Problem solved & Running. The functions of the remote cannot be changed. AC will automatically change after 6 hours. Everything has been…
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 ❎Level Sensor problem. 02…
Specification SL No Specification criteria Specifications 1 Model PLC-104-ST-25-15 2 Configuration Type Configuration Type 3 Package Style Steel Tube, Bare Fiber 4 Fiber…
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…