IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
Breaker installation for SCADA control Room Monitor Done
Dtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning