The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
ScadaPack transfer from DTW-207 to 202 Done