SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
All panel cleaning completed.
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
Checking Step SL Checking Stage Remarks MOV physical status (Wiring, OK 1 MOV to RTU Panel Terminal MOV ok. 2 SCADAPACK Analog output…
Fiber Optical Maintenance Near DTW-103
Findings: Communication isn’t occurred in GiMAC meter. Action taken: 1. Physically check. Checked by modbuspool. GiMAC meter comm. Port has problem. Only transmit…