Similar Posts
- ACTIVITY | CCTV | DAILY REPORTS | DTW
DTW#105 CCTV Checking Maintenance Complete.
Posted onProblem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…
Fujikura New Model CT50 CT-50 High Precision Fiber Optic Cleaver Cutter The Most Robust Cleaver
Posted onSpecification SL No Specification criteria Specifications 1 Brand FUJIKURA 2 Part Number CT-50 3 Item Weight 3 pounds 4 Product Dimensions 3.2 x…
- ACTIVITY | DAILY REPORTS | MOV
OGR booster pump F MOV limit switch adjustment complete.
Posted onProblem: When the pump is stopped and normally shuts off, a fault automatically occurs in the mov. In this case the valve is…
- ACTIVITY | DAILY REPORTS | DTW | REPORTS
DTW- 120 LIT And PIT Maintenance
Posted onDTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
- ACTIVITY | DAILY REPORTS | DTW | REPORTS
OPTICAL FIBER MAINTENANCE AT DTW-104
Posted onIn DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…
IRP-1 sand filter “E” ultrasonic level transmitter installing.
Posted onNew parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…