IRP-2 All Dome Camera Lens Cleaning Done





IRP-2 All Dome Camera Lens Cleaning Done





IRP-1 Sand Filter FCP Panel Cleaning Done
Float switch reconnection and rearrange. Now normal
There was so much dust
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
DTW-113 Scada Pack Programing And Install Done