IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

















IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

















1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
1.Cable connector change 2. IP Setup
AC Problem solved & Running. The functions of the remote cannot be changed. AC will automatically change after 6 hours. Everything has been…
Breaker installation for SCADA control Room Monitor Done
DTW-102 Scada Pack Programing And Install Done