IRP-1 Office Building 1 Nos New Camera Install For Security Purpose


IRP-1 Office Building 1 Nos New Camera Install For Security Purpose


Table of Contents DTW SCADA PANEL ROOM OGR ELECTRICAL PANEL ROOM SAND FILTER ELECTRICAL PANEL ROOM DOME CAMERA PANEL DTW SL NO Item…
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
Previous ONU frequently becomes unstable/hang. So replace the ONU.
Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…