To solve this problem, we increase the height 1 meter more and change the direction.
Similar Posts
PIT Report 2022
Posted onPIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…
- ACTIVITY | CCTV | DAILY REPORTS | DTW
DTW-206 New POE Switch installing & CC Camera checking
Posted onProblem found: POE Switch & 4 NOS CC camera problem found.
- ACTIVITY | DAILY REPORTS | DTW
DTW – 111 LIT Maintenance Work Complete.
Posted onDtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
IRP-2 ALL LOP Panel Cleaning
Posted onThere was so much dust
IRP-1 SDB Additional Dewatering Pump Fault check
Posted onIRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…