Due to solving those problems :
- Modbus ground connection check.
- VFD frequency regulator loose connection check.
- SPD check .
- RJ-45 connector check.
- Cable check.
- VFD controller Check.
- System Earth Resistance Check etc.





Due to solving those problems :





Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 203 UVR checked, When plug PTT UVR…
DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…
There was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…
ScadaPack transfer from DTW-207 to 202 Done
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…