1.DTW-114 1Nos Camera Install Done
2.New UTP Cable Install
3.Connector Change
Now DTW-114 5Nos Camera in Operation







1.DTW-114 1Nos Camera Install Done
2.New UTP Cable Install
3.Connector Change
Now DTW-114 5Nos Camera in Operation







DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
Checking and maintenance of 2 field pumps completed.
ScadaPack transfer from DTW-207 to 202 Done
Previous PoE switch has port problem.