In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust