IRP-1 Office Building 1 Nos New Camera Install For Security Purpose


IRP-1 Office Building 1 Nos New Camera Install For Security Purpose


Observation: Radio communication checking complete DTW 213.1. In DTW 213, We checked up to 10 minutes. RSSI Value (Dc volts) MAX: 2.395V, MIN:…
Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…
Problem: This MOV is abnormal working. MOV Open time & close time 0% to 100% value not showing. IRP-2 3V07A MOV Reset, reprogramming…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done