There was so much dust














There was so much dust














CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
1.Cable connector change 2. IP Setup
IRP-1 Sand Filter FCP Panel Cleaning Done
Dtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning