After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.














After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.












1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist