

After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.














After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.












DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)
PLC-102-MM-90-SCA-15 Specification SL No Specification criteria Specifications 1 Package Style Mini Module 2 Configuration Type 1x 2 3 Fiber Grade G.657A1 4 Connector…