  • ACTIVITY | CCTV | NETWORK CONNECTIVITY

    Optical Fiber restoration work at DTW103

    Posted onSeptember 7, 2022September 24, 2022

    In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

    Listen to the Message Optical Fiber restoration work at DTW103Continue

  • ACTIVITY | DAILY REPORTS | MOV

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

  • ACTIVITY | DAILY REPORTS

    OGR Booster Pump supply fan (4M02B) checking and findings.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

  • ACTIVITY | CCTV | DTW

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

  • Uncategorized

    DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checking

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checkingContinue

  • ACTIVITY | DTW | MONTHLY REPORTS

    DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.Continue

  • MONTHLY REPORTS

    Electrical Team Monthly work plan(September-22)

    Posted onSeptember 6, 2022September 6, 2022

    Sl No. Date Location Task Name Work update Remarks 2 9/3/2022 33 KV interlink HT Network visual checking & Monthly tree trimming work….

    Listen to the Message Electrical Team Monthly work plan(September-22)Continue

  • ACTIVITY | CCTV | DTW | MONTHLY REPORTS

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .Continue

  • Uncategorized

    DTW203 LV panel, ACB, UVR ELD checking & cleaning.

    Posted onSeptember 5, 2022September 5, 2022

    Listen to the Message DTW203 LV panel, ACB, UVR ELD checking & cleaning.Continue

  • ACTIVITY | DTW | MONTHLY REPORTS

    DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.Continue

Page navigation

Previous PagePrevious 1 … 44 45 46 47 48 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers