  • ACTIVITY | DAILY REPORTS | MOV

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

  • ACTIVITY | DAILY REPORTS

    OGR Booster Pump supply fan (4M02B) checking and findings.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

  • ACTIVITY | CCTV | DTW

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

  • Uncategorized

    DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checking

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW208 LV panel, ACB,ATS,ELD,UVR cleaning & visual checkingContinue

  • ACTIVITY | DTW | MONTHLY REPORTS

    DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.Continue

  • MONTHLY REPORTS

    Electrical Team Monthly work plan(September-22)

    Posted onSeptember 6, 2022September 6, 2022

    Sl No. Date Location Task Name Work update Remarks 2 9/3/2022 33 KV interlink HT Network visual checking & Monthly tree trimming work….

    Listen to the Message Electrical Team Monthly work plan(September-22)Continue

  • ACTIVITY | CCTV | DTW | MONTHLY REPORTS

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .Continue

  • Uncategorized

    DTW203 LV panel, ACB, UVR ELD checking & cleaning.

    Posted onSeptember 5, 2022September 5, 2022

    Listen to the Message DTW203 LV panel, ACB, UVR ELD checking & cleaning.Continue

  • ACTIVITY | DTW | MONTHLY REPORTS

    DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.Continue

  • DTW | MONTHLY REPORTS

    SCADA PACK REPORT IRP 1/2

    Posted onSeptember 4, 2022September 5, 2022

    SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…

    Listen to the Message SCADA PACK REPORT IRP 1/2Continue

Page navigation

Previous PagePrevious 1 … 44 45 46 47 48 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers