IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU