- 2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup






when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
Issue Forward to the electrical team.
Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…
DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…
Cleaning Status: Completed. Findings: No problem found.