Cleaning Status: Completed.
Findings: No problem found.
Cleaning Status: Completed.
Findings: No problem found.
IRP-1 Office Building 1 Nos New Camera Install For Security Purpose
Previous PoE switch has port problem.
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…