In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
1.Cable connector change 2. IP Setup
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
One Comment