Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • SCADA PACK REPORT IRP 1/2
    DTW | MONTHLY REPORTS

    SCADA PACK REPORT IRP 1/2

    Posted onSeptember 4, 2022September 5, 2022

    SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…

    Listen to the Message SCADA PACK REPORT IRP 1/2Continue

  • Instrumentation of Month (September,2022)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    Instrumentation of Month (September,2022)

    Posted onSeptember 4, 2022October 17, 2022

    Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…

    Listen to the Message Instrumentation of Month (September,2022)Continue

  • IRP-1/2 Optical Fiber Maintenance Report
    ACTIVITY | CCTV | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    IRP-1/2 Optical Fiber Maintenance Report

    Posted onAugust 30, 2022September 5, 2022

    IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No.  Location  Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…

    Listen to the Message IRP-1/2 Optical Fiber Maintenance ReportContinue

  • ACTIVITY | DAILY REPORTS | Pappu

    DTW210 to DTW213 Optical Fiber Maintenance Work

    Posted onAugust 25, 2022August 25, 2022

    Listen to the Message DTW210 to DTW213 Optical Fiber Maintenance WorkContinue

  • ACTIVITY | DAILY REPORTS

    DTW201 Mass Cleaning

    Posted onAugust 22, 2022August 25, 2022

    Listen to the Message DTW201 Mass CleaningContinue

  • MONTHLY REPORTS | Uncategorized

    MONTHLY REPORT 2022

    Posted onAugust 17, 2022August 21, 2022

    Listen to the Message MONTHLY REPORT 2022Continue

  • CCTV

    CCTV Camera IP Address With Status

    Posted onAugust 14, 2022November 13, 2022

    IP By NAV SL. No IP Location Status Remarks 1 192.168.0.101 DTW101 (NAV/1) DOME ✅ 2 192.168.0.102 DTW101 (NAV/1) BULLET ✅ 3 192.168.0.103…

    Listen to the Message CCTV Camera IP Address With StatusContinue

  • DTW-118,122,220 & 205 automatic start-stop problem solved
    ACTIVITY | Parvez | REPORTS

    DTW-118,122,220 & 205 automatic start-stop problem solved

    Posted onJuly 30, 2022August 1, 2022

    Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…

    Listen to the Message DTW-118,122,220 & 205 automatic start-stop problem solvedContinue

  • Daily Work List July 2022
    MONTHLY REPORTS

    Daily Work List July 2022

    Posted onJuly 28, 2022August 14, 2022

    Listen to the Message Daily Work List July 2022Continue

  • Instrumentation Findings of Month (July,2022)
    MONTHLY REPORTS

    Instrumentation Findings of Month (July,2022)

    Posted onJuly 27, 2022September 4, 2022

    SL/NO PROBLEMS TAG LOCATION REMARK 1 When the pump runs, the pump Motor + MOV runs together.  Which does not follow the normal…

    Listen to the Message Instrumentation Findings of Month (July,2022)Continue

Page navigation

Previous PagePrevious 1 … 16 17 18 19 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers