1.Cable connector change 2. IP Setup

1.Cable connector change 2. IP Setup

Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Previous ONU frequently becomes unstable/hang. So replace the ONU.